坝内引水管
We adopt water-jet method to embedded well point pipe.
我们采用" 射水法"埋设井点管.
In the process of mass concrete construction, in order to meet the requirement of concrete temperature control and joint grouting, cooling water pipe should be embedded in the concrete for cooling.
在大体积混凝土施工过程中,为满足混凝土温控及接缝灌浆的要求,需在其体内埋设冷却水管进行通水冷却。
纳米英语 · 双语娱乐资讯